F OPERATING INSTRUCTIONS FOR VICAT APPARATUS ~ OPERATING INSTRUCTIONS for construction equipments

OPERATING INSTRUCTIONS FOR VICAT APPARATUS



VICAT APPARATUS WITH DASHPOT





Working Manual


OPERATING INSTRUCTIONS
FOR
VICAT APPARATUS WITH DASHPOT

The equipment comprises of the following :

1.     One metallic frame bearing a movable rod with a cap at top
2.     One Vicat Mould
3.     One Glass Base Plate
4.     One Initial Needle, in plastic container
5.     One Final  Needle, in plastic container
6.     One Consistency Plunger, in plastic container
7.     One Operating  Instructions with General Assembly Drawing.
--------------------------------------------------------------------------------------------

I
NTRODUCTION :  The equipment is meets the requirement of IS: 5513. There are used for the determination of Standard Consistency Initial Setting Time and Final Setting Time of  cement paste of Ordinary Portlanmd Cement, Rapid Hardening Portland Cement, Low Heat Portland Cement, and other Hydraulic Cements as per procedure described in IS - 1727, 2541 (P.I), 2645, 4031, BS : 12, 146, 915, 1370, 4027, 4246, 4248, ASTM C-91, C-141, C-187, C-191, C-308, C-472 and ASSHO T-129 E-131.

'HT' Model has an additional attachment of dash pot which facilitates lowering of movable rod slowly.

DESCRIPTION :  The equipment are illustrated in the General Assembly Drawing  attached.  The instrument consists of a metallic frame bearing a movable rod with a cap at one end.  At the other end, any one of the following attachment which are interchangeable may be attached.
1.     Initial Needle
2.     Final Needle
3.     Plunger

The movable bearing rod carries an indicator which moves over a graduated scale attached to the frame.  A release pin is provided for holding the movable rod while  fixing the needle or plunger. In  'HT' make  model, a dash pot is fitted to the frame.  The dash pot is filled with oil of low viscosity  (oil is not supplied) helps in lowering the movable rod slowly.  It is recommended to use 3-in-1 or singer oil or any equivalent oil of low viscosity.

VICAT MOULD : The mould is in the form of frustum of a cone having internal diameter at upper and lower end 70 + 0.5 and 60 + 0.5 mm respectively and a height of 40 + 0.5 mm.

INITIAL NEEDLE : The needle is circular in cross-section having a cross sectional area of 1mm2. The end of the needle is flat .  This is used for the determination of the initial setting of the cement.

FINAL NEEDLE:  The needle is circular in cross-section having a cross sectional area of 1mm2.  The needle is fitted in a metal attachment (hollowed out).  The end of the needle projects beyond the cutting edge of the hollowed out metal attachment.  This is used for determining the final setting time of cement.

PLUNGER : The Plunger is known as the consistency plunger.  It is made of polished brass with a projection at the upper end for insertion into the movable rod.  The lower end is flat.

SETTING UP : Keep the Vicat Apparatus on a level base.  When using 'HT' model keep the movable rod at its highest position and hold it with the pin.  Unscrew the top of the dashpot.  Half fill the dashpot with suitable oil of low viscosity and screw on the top.  Work the plunger a couple of times.

TEMPERATURE FOR TESTING :  The temperature range within which physical tests may be carried out should , as far as possible be 27OC + 2OC.

DETERMINATION OF CONSISTENCY OF STANDARD CEMENT PASTE :
1.     DEFINATION : The standard consistency of cement past is that which will permit the Vicat Plunger to penetrate to a point 5 to 7mm from the bottom of the Vicat Mould, when cement is tested as described below.
2.     SPECIMEN PREPARATION : Take 400g of weighed cement in a dish.  Run down a known quantity of water from the burette into the dish and mix it thoroughly taking care that the time of gauging is neither less than 3 minutes nor more than 5 minutes and that gauging is completed before any sign of setting occurs.  Gauging time is the time elapsing from the time of adding water to the dry material until commencing to fill the mould.  Clean appliances shall be used for gauging.  The gauging trowel (Gauging Trowel supplied as accessory at extra cost) and operator's hand shall alone be used.
3.     TEST PROCEDURE : Apply petroleum jelly to the inner surface of the Vicat Mould and the base plate, so that there may not be any leakage of water.  Fit the plunger to the movable rod.  Prepare the cement paste as described above and fill mould.  For filling the mould, operator's hand and the blade of gauging trowel shall alone be used.  Level-off the surface of the mould, place the whole assembly on the base of the Vicat Apparatus and slowly bring down the plunger attached  to the bearing rod to the surface of the cement paste and quickly release.  (when 'HT' model Vicat Needle Apparatus with dashpot is used, place the mould filled with cement paste and the non-absorbent plate on the base plate of the Vicat Apparatus.  Raise the plunger of the dashpot, bring it in contact with the top cap of the movable bearing rod, remove the pin holding the movable bearing rod to the surface of the cement paste and quickly release by pushing down the plunger of the dashpot with hand).  All these operations are to be carried out within the minimum possible time after filling the mould, so that there may not be any setting.  If the signs of setting are observed, reject the paste and start with fresh specimen.

Prepare the trial paste with varying percentages of water until plunger penetrates to a point 5 to 7mm from the bottom of the Vicat Mould, which is read on the scale.  Express the water required as percentage by weight of the dry cement.  The apparatus shall be free from vibrations during the test.

DETERMINATION OF INITIAL SETTING TIME :
1.     SPECIMEN PREPARATION : Prepare neat cement paste by gauging the cement with 0.85 times the water required to give a paste of standard consistency in the manner and under the conditions already described above preferably in an atmosphere of 90% relative humidity.  Start a stop watch at the time water is added to the cement.  Remove the grease on the initial needle.
2.     TEST PROCEDURE : Attach a needle for the determination of initial setting time to the movable bearing rod of the Vicat Apparatus.  Place the glass plate on the base of the Vicat Apparatus.  Lower the movable rod and rest the needle on the plate.  Raise the rod and pin it.  Note the reading on the scale.  Fill the mould, positioned on the glass plate, with cement paste.

In filling the mould, operator's hands and the gauging trowel shall alone be used. Place the mould with the test block on glass plate on the base of the Vicat apparatus under bearing rod to which the initial needle is attached.   Slowly bring down the needle to the surface of the cement paste and quickly release (When  'HT' model Vicat Apparatus with dash pot is used, place the mould filled with cement paste and the glass plate on the base of the Vicat Needle Apparatus).

Raise the plunger of the dashpot, bring it in contact with the top cap of the movable rod, remove the pin holding the movable bearing rod and bring down the initial needle attached to the movable bearing rod to the surface of the cement paste and quickly release by pushing down the plunger of the dashpot with hand.

Note down the reading on the scale.  Similarly, take penetration reading at a regular interval, say at every 10 minutes.  Be vigilant as the setting time approaches and observe the penetration at smaller  intervals.  Every time, clean the needle from the sticking cement paste soon after it is withdrawn.  Note the time when the needle rests, about a point 5 + 0.5mm from the original reading which corresponds to the bottom of the Vicat Mould.  This gives the initial setting time.

    
DETERMINATION OF FINAL SETTING TIME:

TEST PROCEDURE : Remove the initial needle and fit in the final needle with hollowed out metallic attachment to the bearing rod. Lower down the needle slowly to contact with the surface of the paste and apply the needle gently to the surface (wile 'HT' Vicat Needle Apparatus with dashpot employ the plunger of the dashpot and set up needle as described under determination of initial setting time test procedure).  Repeat the same operation at regular intervals of time until the projection makes a mark  on the surface of the test block while metallic attachment fails to do so .  Note down the time.

The period elapsing  between the time when water is added the dry material and the time at which the needle makes an impression on the surface while the attachment fails to do so, when upon applying the needle gently to the surface, gives the final setting time.

In the event of a scum forming on the surface of the test block, the under side of the test block may be used for determining the final test.

Take at least three specimens and take the mean as the final setting time.

SPECIFICATIONS FOR SETTING TIMES OF VARIOUS TYPES OF CEMENTS

Sr.No.
TYPE  OF CEMENT
INITIAL SETTING TIME NOT LESS THAN
FINAL SETTING TIME NOT MORE THAN
1.
Ordinary Portland
30 minutes
600 minutes
2.
Rapid Hardening Portland
30 minutes
600 minutes
3.
Low Heat Period
60 minutes
600 minutes

PRECAUTIONS :
1.     The apparatus should remain free from vibrations during the test.
2.     Care should be taken that the initial needle is not bent and is fixed vertically straight into the movable rod.
3.     The needles and the plunger should be kept free from the adhering cement, as the cement adhering on the sizes may retard penetration and cement at the bottom may increase.
4.     All the tests should be carried out at 27OC + 2OC and 90% relative humidity.
5.     Petroleum Jelly should be applied to the mould.

MAINTENANCE: BEARING ROD SHOULD BE OILED PERIODICALLY AND THE NEEDLES SHOULD BE KEPT IN THEIR RESPECTIVE  CASES AFTER THESE ARE CLEANED & GREASED.



Previous
Next Post »

OPERATING INSTRUCTIONS FOR DIRECT SHEAR APPARATUS MULTIPLE TYPE, MOTORISED 12 SPEEDS

OPERATING INSTRUCTIONS FOR DIRECT SHEAR APPARATUS MULTIPLE TYPE, MOTORISED 12 SPEEDS The   equipment comprises the following :- 1. ...